Boiler Pressure Part

CAPABILITY

7,800 Ton per year

FACILITIES

Under Roof Workshop 21,600 m could cover all activities for fabrication of boiler pressure part.

FACILITIES

  • Membrane Panel Welding 24+8,
  • Welding Manipulator,
  • 4” Pipe Bender,
  • 4” NC Pipe Bender,
  • 8 Electrode Panel Welder,
  • 4 Electrode Gantry Welder,
  • Equipment for Surface Preparation using for Tube, Pipe, and PWHT Furnace size 14m x 6m x 4m

BORSCOPE VISUAL INSPECTION

WELDING 9CR PROCESS

PRODUCT DELIVERY

OUR PRODUCT

BOILER FOR KASHIMA KP2 PROJECT

PRESSURE PART FOR JIMAH POWER PLANT

COOLING WATER PIPE FOR CENTRAL JAVA 2 X 1000 MW

FABRICATION PIPING FOR PATUHA PROJECT